Tender Description:
Survey, Soil testing, Design, Supply and Const., Installation, Commissioning of 4MLD STP at Samrala Town based on any suitable, sustainable and proven technology, Including O and M for 60 months after stabilization period of 3 months under HUDCO Loan
Dates:
Published on
Aug. 21, 2019, 11 p.m.
Bid Opening Date
Sept. 17, 2019, 8:30 p.m.
Doc Download started
Aug. 21, 2019, 11:10 p.m.
Doc Download ended
Sept. 16, 2019, 9:30 p.m.