HANDLING AT SITE STORES/ STORAGE YARD, DISMANTALING OF 22kV AIS IN HBB & CO- GEN SUB- STATION AND REPLACEMENT WITH 22kV GIS, REMOVAL, RELAYING, RE- TERMINATION & TERMINATION OF 33kV XLPE CABLE, LT POWER, CONTROL AND SIGNAL CABLES, CABLE TRAY, ABOVE GROUND EARTHING, POWER TRANSFORMER, LEAN GAS COMPRESSOR, CONTROL & PROTECTION PANELS, DAVR LTSWGR, C & I INSTRUMENTS, CONTROL PANELS OF DCS PANELS, REMOVAL OF CONTROL/ RELAY PANEL OF SUB – STATION, RELOCATION INSTRUMENT OF EXISTING SKIDS ETC TRANSPORTATION TO SITE, COMPLETE ERECTION, CHECKING OF CALIBRATION, TESTING, COMMISSIONING AND HANDING OVER OF CONTROL & INSTRUMENTATION & ELECTRICAL WORKS FOR COGENERATION GAS TURBINE- IV CAPTIVE POWER PLANT 1x15 MW GTG + 1x60 TPH HRSG + BOP PACKAGES AND ADDITIONAL LEAN GAS COMPRESSOR PROJECTS AT ONGC Uran Plant, District: Raigad, State: Maharashtra.