ERECTION, TESTING, COMMISSIONING, TRIAL/ INITIAL OPERATION AND HANDING OVER OF STEAM TURBINE, GENERATOR, INTEGRAL PIPING AND OTHER AUXILIARIES OF THE SYSTEM INCLUDING BOIs, PUMPS, INSULATION etc. AND FINAL PAINTING OF THE UNIT INCLUDING SUPPLY OF PAINTS OF 1X660 MW PANKI THERMAL POWER PROJECT, PANKI, KANPUR, U. P.